 {"id":1860,"date":"2020-01-13T09:05:52","date_gmt":"2020-01-13T09:05:52","guid":{"rendered":"http:\/\/www.bbe.es\/areas-de-la-central\/"},"modified":"2021-05-06T10:57:22","modified_gmt":"2021-05-06T10:57:22","slug":"areas-of-de-power-station","status":"publish","type":"page","link":"https:\/\/www.bbe.es\/en\/technical-description\/areas-of-de-power-station\/","title":{"rendered":"Areas of de power station"},"content":{"rendered":"<!-- Zentralaren orientazioa: BEGIN -->\r\n\t<section class=\"module p-b-0 module-top \">\r\n<div class=\"container\">\r\n\t\t<div class=\"row\">\r\n\t\t\t<div class=\"col-lg-12 m-auto p-b-20\">\r\n\t\t\t\t<div class=\"bbe-heading\">\r\n\t\t\t\t\t<h2>Plant management<\/h2>\r\n\t\t\t\t<\/div>\r\n\t\t\t<\/div>\r\n\r\n\r\n\t\t<\/div>\r\n\r\n\t<div class=\"row\">\r\n        \r\n        \r\n\t\r\n\t<div class=\"col-lg-12 bbe-image-clip\">\r\n\t\t<p class=\"text-center\"><img alt=\"\" width=\"1100\" height=\"450\" class=\"lazyload\" data-src=\"http:\/\/www.bbe.es\/assets\/media\/areas-de-la-central-1100x450-1.jpg\"><\/p>\r\n         <\/div>\r\n      <\/div>\r\n\t\r\n\t\r\n\t<div class=\"row m-t-20\">\r\n        \r\n         <div class=\"col-lg-12\">\r\n            \r\n\t\t\t <p>In general terms, the plant is operated from the control room which sends out the requisite number of monitoring and control signals to execute the actions involved in running the plant.<\/p>\r\n\r\n\t\t\t\t<p>The gas turbine, steam turbine and other packaged plant facilities located at the site such as the water treatment plant, the chemical dosing unit, seawater filtering unit, etc, all have their own control panels so that they can be operated locally. These local panels are linked to the plant\u00b4s distributed control system when sends out commands controlling the main functions they perform.<\/p>\r\n\t\t\t \r\n         <\/div> \r\n\t\r\n\t\r\n      <\/div>\r\n\t<\/div>\r\n<\/section>\r\n\t\r\n\t<!-- Plant management: END -->\r\n\t\r\n\t<!-- General plant layout: BEGIN -->\r\n\t<section class=\"module module-low \">\r\n<div class=\"container\">\r\n\t\r\n\t<div class=\"row\">\r\n\t\t\t<div class=\"col-lg-12 m-auto p-b-20\">\r\n\t\t\t\t<div class=\"bbe-heading\">\r\n\t\t\t\t\t<h2>General plant layout<\/h2>\r\n\t\t\t\t<\/div>\r\n\t\t\t<\/div>\r\n\r\n\r\n\t\t<\/div>\r\n\t\r\n\t<div class=\"row\">\r\n\t\t\t<div class=\"col-lg-12 m-auto\">\r\n\t\t\t\t\r\n\t\t\t\t<p>The plant\u00b4s buildings and facilities are located in a relatively compact area. Industrial architectural criteria normally applied to this type of plant have been used to design the buildings. The various zones that make up the plant are described below:<\/p>\r\n<\/div>\r\n<\/div>\r\n\t\r\n\r\n\t\r\n\t\t<\/div><\/section>\r\n\t\r\n\t<!-- General plant layout: END -->\r\n\t\r\n\t<!-- Gas turbine zone: BEGIN -->\r\n\t<section class=\"module module-low bg-light\">\r\n<div class=\"container\">\r\n\t\r\n\t<div class=\"row\">\r\n\t\t\t<div class=\"col-lg-12 m-auto\">\r\n\t\t\t\t<div class=\"bbe-heading\">\r\n\t\t\t\t\t<h2>Gas turbine zone<\/h2>\r\n\t\t\t\t<\/div>\r\n\t\t\t<\/div>\r\n\r\n\r\n\t\t<\/div>\r\n\t\r\n\t<div class=\"row m-t-20\">\r\n        \r\n         \r\n\t\r\n\t<div class=\"col-lg-12 bbe-image-clip\">\r\n\t\t<p class=\"text-center\"><img alt=\"\" width=\"1100\" height=\"450\" class=\"lazyload\" data-src=\"http:\/\/www.bbe.es\/assets\/media\/areas-de-la-central-02-1100x450-1.jpg\"><\/p>\r\n         <\/div>\r\n\t\t\r\n\t\t\r\n\t\t\r\n      <\/div>\r\n\t\r\n\t<div class=\"row  m-t-20\">\r\n        \r\n         \r\n\t\r\n\t\t\r\n\t\t<div class=\"col-lg-12\">\r\n            \r\n\t\t\t <p>The gas turbines and their auxiliary systems are housed in a two-storey building. The turbine\u00b4s air intake filters are supported on the lowest section of ceiling in the building. Two overhead travelling cranes have been installed for maintenance purposes, one in the turbine zone and the other in the turbine generator zone.<\/p>\r\n\t\t\t \r\n         <\/div> \r\n\t\t\r\n      <\/div>\r\n\t\r\n\r\n\t\r\n\t\t<\/div><\/section>\r\n\t\r\n\t<!-- Gas turbine zone: END -->\r\n\t\r\n\t<!-- Steam turbine zone: BEGIN -->\r\n\t<section class=\"module module-low \">\r\n<div class=\"container\">\r\n\t\r\n\t<div class=\"row\">\r\n\t\t\t<div class=\"col-lg-12 m-auto\">\r\n\t\t\t\t<div class=\"bbe-heading\">\r\n\t\t\t\t\t<h2>Steam turbine zone<\/h2>\r\n\t\t\t\t<\/div>\r\n\t\t\t<\/div>\r\n\r\n\r\n\t\t<\/div>\r\n\t\r\n\t<div class=\"row m-t-20\">\r\n        \r\n         \r\n\t\r\n\t<div class=\"col-lg-12 bbe-image-clip\">\r\n\t\t<p class=\"text-center\"><img alt=\"Turbina vapor\" width=\"1100\" height=\"450\" class=\"lazyload\" data-src=\"http:\/\/www.bbe.es\/assets\/media\/turbina-vapor-1.jpg\"><\/p>\r\n         <\/div>\r\n      <\/div>\r\n\t\r\n\t<div class=\"row align-items-center m-t-20\">\r\n        \r\n         <div class=\"col-lg-12\">\r\n            \r\n\t\t\t <p>The steam turbine stands on a platform with the condenser situated beneath the low-pressure stage exhaust. The turbine\u00b4s auxiliary facilities (oil, lubrication, electrical support unit, hydrogen sealing oil, etc.) can be found on the mezzanine floors. The overhead travelling crane runs parallel to the turbine shaft and can access all areas.<\/p>\r\n\r\n\t\t\t <p>The water supply pumps are located at ground level between the turbine building and the electrical control room. The degasifier is situated above them on the same level as the turbine.<\/p>\r\n\t\t\t \r\n         <\/div> \r\n\t\r\n\t\r\n      <\/div>\r\n\t\r\n\t\r\n\r\n\t\r\n\r\n\t\r\n\t\t<\/div><\/section>\r\n\t\r\n\t<!-- Steam turbine zone: END -->\r\n\r\n\t\r\n\t<!-- Transformer zone: BEGIN -->\r\n\t<section class=\"module module-low \">\r\n<div class=\"container\">\r\n\t\r\n\t<div class=\"row\">\r\n\t\t\t<div class=\"col-lg-12 m-auto p-b-20\">\r\n\t\t\t\t<div class=\"bbe-heading\">\r\n\t\t\t\t\t<h2>Transformer zone<\/h2>\r\n\t\t\t\t<\/div>\r\n\t\t\t<\/div>\r\n\r\n\r\n\t\t<\/div>\r\n\t\r\n\t<div class=\"row\">\r\n\t\t\t<div class=\"col-lg-12 m-auto\">\r\n\t\t\t\t\r\n\t\t\t\t<p>The main transformers can be found between the turbine building and the substation, facilitating output towards the latter.<\/p>\r\n<\/div>\r\n<\/div>\r\n\t\r\n\r\n\t\r\n\t\t<\/div><\/section>\r\n\t\r\n\t<!-- Transformer zone: END -->\r\n\t\r\n\t<!-- Heat recovery steam generator zone: BEGIN -->\r\n\t<section class=\"module module-low bg-light\">\r\n<div class=\"container\">\r\n\t\r\n\t<div class=\"row\">\r\n\t\t\t<div class=\"col-lg-12 m-auto p-b-20\">\r\n\t\t\t\t<div class=\"bbe-heading\">\r\n\t\t\t\t\t<h2>Heat recovery steam generator zone<\/h2>\r\n\t\t\t\t<\/div>\r\n\t\t\t<\/div>\r\n\r\n\r\n\t\t<\/div>\r\n\t<div class=\"row\">\r\n<div class=\"col-lg-12 p-0 bbe-image-clip\">\r\n\t<p class=\"text-center\"><img alt=\"\" width=\"1100\" height=\"450\" class=\"lazyload\" data-src=\"http:\/\/www.bbe.es\/assets\/media\/areas-de-la-central-03-1100x450-1.jpg\"><\/p>\r\n         <\/div> <\/div>\r\n\r\n\r\n\t<div class=\"row\">\r\n\t\t\t<div class=\"col-lg-12 m-auto m-t-20\">\r\n\t\t\t\t\r\n\t\t\t\t<p>The heat recovery steam generators are housed inside a covered facility. These boilers are connected to a 125-m smokestack with a concrete shaft and independent gas pipes for each boiler.<\/p>\r\n<\/div>\r\n<\/div>\r\n\t\r\n\t\r\n\t\r\n\r\n\t\r\n\t\t<\/div><\/section>\r\n\t\r\n\t<!-- Heat recovery steam generator zone: END -->\r\n\t\r\n\t\r\n\t\t<!-- Electrical control room, main control room and offices: BEGIN -->\r\n\t<section class=\"module module-low \">\r\n<div class=\"container\">\r\n\t\r\n\t<div class=\"row\">\r\n\t\t\t<div class=\"col-lg-12 m-auto p-b-20\">\r\n\t\t\t\t<div class=\"bbe-heading\">\r\n\t\t\t\t\t<h2>Electrical control room, main control room and offices<\/h2>\r\n\t\t\t\t<\/div>\r\n\t\t\t<\/div>\r\n\r\n\r\n\t\t<\/div>\r\n\t\r\n\t<div class=\"row\">\r\n\t\t\t<div class=\"col-lg-12 m-auto\">\r\n\t\t\t\t\r\n\t\t\t\t<p>The electrical equipment rooms and the chemical laboratory are on the ground floor. The main control room is on the top floor, right above the electrical equipment rooms. Alongside are the general offices, which sit above the laboratory.<\/p>\r\n<\/div>\r\n<\/div>\r\n\t\r\n\r\n\t\r\n\t\t<\/div><\/section>\r\n\t\r\n\t<!-- Electrical control room, main control room and offices: END -->\r\n\t\r\n\t<!-- Pipe rack zone: BEGIN -->\r\n\t<section class=\"module module-low \">\r\n<div class=\"container\">\r\n\t\r\n\t<div class=\"row\">\r\n\t\t\t<div class=\"col-lg-12 m-auto p-b-20\">\r\n\t\t\t\t<div class=\"bbe-heading\">\r\n\t\t\t\t\t<h2>Pipe rack zone<\/h2>\r\n\t\t\t\t<\/div>\r\n\t\t\t<\/div>\r\n\r\n\r\n\t\t<\/div>\r\n\t\r\n\t<div class=\"row\">\r\n\t\t\t<div class=\"col-lg-12 m-auto\">\r\n\t\t\t\t\r\n\t\t\t\t<p>A pipe rack runs between the gas turbine and boiler buildings and carries the main and auxiliary pipes.<\/p>\r\n<\/div>\r\n<\/div>\r\n\t\r\n\r\n\t\r\n\t\t<\/div><\/section>\r\n\t\r\n\t<!-- Pipe rack zone: END -->\r\n\t\r\n\t\r\n\t<!-- Auxiliary plant zones -->\r\n\t<section class=\"module module-low \">\r\n<div class=\"container\">\r\n\t\r\n\t<div class=\"row\">\r\n\t\t\t<div class=\"col-lg-12 m-auto p-b-20\">\r\n\t\t\t\t<div class=\"bbe-heading\">\r\n\t\t\t\t\t<h2>Auxiliary plant zones<\/h2>\r\n\t\t\t\t<\/div>\r\n\t\t\t<\/div>\r\n\r\n\r\n\t\t<\/div>\r\n\t\r\n\t<div class=\"row\">\r\n\t\t\t<div class=\"col-lg-12 m-auto\">\r\n\t\t\t\t\r\n\t\t\t\t<p>The water treatment units, sewage tanks, and the compressed-air and fire-prevention systems are located right by the entrance to the facility.<\/p>\r\n<\/div>\r\n<\/div>\r\n\t\r\n\r\n\t\r\n\t\t<\/div><\/section>\r\n\t\r\n\t<!-- Auxiliary plant zones: END -->\r\n\t\r\n\t\r\n\t<!-- Information on the construction of the Bah&iacute;a de Bizkaia Electricidad S.L. (BBE).: BEGIN -->\r\n\t<section class=\"module module-low \">\r\n<div class=\"container\">\r\n\t\r\n\t<div class=\"row\">\r\n\t\t\t<div class=\"col-lg-12 m-auto p-b-20\">\r\n\t\t\t\t<div class=\"bbe-heading\">\r\n\t\t\t\t\t<h2>Information on the construction of the Bah\u00eda de Bizkaia Electricidad S.L. (BBE).<\/h2>\r\n\t\t\t\t<\/div>\r\n\t\t\t<\/div>\r\n\r\n\r\n\t\t<\/div>\r\n\t\r\n\t<div class=\"row m-t-20 p-b-100\">\r\n        \r\n         <div class=\"col-md-6\">\r\n            \r\n\t\t\t <h3 class=\"m-t-20\">GENERAL INFORMATION<\/h3>\r\n\t\t\t   <ul class=\"list-bbe\">\r\n\t\t\t   \r\n\t\t\t\t   <li><strong>Promoter:<\/strong> BP, EVE, Iberdrola eta Repsol YPF.<\/li>\r\n\t\t\t\t   <li><strong>Author of project:<\/strong> UTE BAIA: Babcock Borsig Espa\u00f1a, Abengoa; Idom.<\/li>\r\n\t\t\t\t   <li><strong>Engineering Project Management:<\/strong> Iberinco.<\/li>\r\n\t\t\t\t   <li><strong>Project Engineering:<\/strong> Idom.<\/li>\r\n\t\t\t   \r\n\t\t\t   <\/ul>\r\n\t\t\t \r\n\t\t\t <h3 class=\"m-t-20\">THERMAL CYCLE<\/h3>\r\n\t\t\t   <ul class=\"list-bbe\">\r\n\t\t\t   \r\n\t\t\t\t   <li><strong>Gas turbine:<\/strong> General Electric.<\/li>\r\n\t\t\t\t   <li><strong>Generators:<\/strong> General Electric.<\/li>\r\n\t\t\t\t   <li><strong>Cleaning of compressors:<\/strong> Eusitrade.<\/li>\r\n\t\t\t   \r\n\t\t\t   <\/ul> \r\n\t\t\t \r\n\t\t\t <h3 class=\"m-t-20\">WATER-VAPOUR CYCLE<\/h3>\r\n\t\t\t   <ul class=\"list-bbe\">\r\n\t\t\t   \r\n\t\t\t\t   <li><strong>Waste heat boilers and boiler valves:<\/strong> Babcock Borsig Espa\u00f1a.<\/li>\r\n\t\t\t\t   <li><strong>HP\/LP vapour tempering:<\/strong> Comeval.<\/li>\r\n\t\t\t\t   <li><strong>Water supply pumps to boilers:<\/strong> Flowserve.<\/li>\r\n\t\t\t\t   <li><strong>Vapour bypass system:<\/strong> CCI Valves.<\/li>\r\n\t\t\t\t   <li><strong>Steam turbine:<\/strong> General Electric.<\/li>\r\n\t\t\t\t   <li><strong>Generator:<\/strong> General Electric.<\/li>\r\n\t\t\t\t   <li><strong>Concrete chimney:<\/strong> Edytesa.<\/li>\r\n\t\t\t   \r\n\t\t\t   <\/ul>\r\n\t\t\t \r\n\t\t\t <h3 class=\"m-t-20\">AUXILIARY SYSTEMS<\/h3>\r\n\t\t\t   <ul class=\"list-bbe\">\r\n\t\t\t   \r\n\t\t\t\t   <li><strong>Auxiliary boiler:<\/strong> Standardkessel Ib\u00e9rica.<\/li>\r\n\t\t\t\t   <li><strong>Condenser:<\/strong> Babcock Borsig Espa\u00f1a.<\/li>\r\n\t\t\t\t   <li><strong>Condensed pumps:<\/strong> Flowserve.<\/li>\r\n\t\t\t\t   <li><strong>Condensed tank:<\/strong> Iberfuel.<\/li>\r\n\t\t\t\t   <li><strong>Vacuum pumps:<\/strong> Nash.<\/li>\r\n\t\t\t\t   <li><strong>Condenser cleaning system:<\/strong> E. Beaudrey.<\/li>\r\n\t\t\t   \r\n\t\t\t   <\/ul>\r\n\t\t\t \r\n\t\t\t <h3>MAIN COOLING<\/h3>\r\n\t\t\t   <ul class=\"list-bbe\">\r\n\t\t\t   \r\n\t\t\t\t   <li><strong>Sea water filtration:<\/strong> E. Beaudrey.<\/li>\r\n\t\t\t\t   <li><strong>Sea water circulation pipe:<\/strong> Noncales.<\/li>\r\n\t\t\t\t   <li><strong>Water circulation pumps:<\/strong> Flowserve.<\/li>\r\n\t\t\t\t   <li><strong>Electric motors:<\/strong> Indar.<\/li>\r\n\t\t\t\t   <li><strong>Minimum cooling service pumps:<\/strong> Flowserve.<\/li>\r\n\t\t\t\t   <li><strong>Condenser cleaning of the water cooling system:<\/strong>E. Beaudrey.<\/li>\r\n\t\t\t\t   <li><strong>Butterfly and back pressure valves:<\/strong> Babcock Borsig Espa\u00f1a.<\/li>\r\n\t\t\t   \r\n\t\t\t   <\/ul> \r\n\t\t\t \r\n\t\t\t <h3 class=\"m-t-20\">AUXILIARY COOLING<\/h3>\r\n\t\t\t   <ul class=\"list-bbe\">\r\n\t\t\t   \r\n\t\t\t\t   <li><strong>Plate exchangers:<\/strong> Alfa Laval.<\/li>\r\n\t\t\t\t   <li><strong>Compensation tank:<\/strong> Noncales.<\/li>\r\n\t\t\t\t   <li><strong>Circulation pumps:<\/strong> Flowserve.<\/li>\r\n\t\t\t\t   <li><strong>Dosing system:<\/strong> Dosapro.<\/li>\r\n\t\t\t\t   <li><strong>Instrumentation:<\/strong> ABB.<\/li>\r\n\t\t\t   <\/ul>\r\n\t\t\t \r\n\t\t\t \r\n\t\t\t <h3 class=\"m-t-20\">GAS SYSTEM<\/h3>\r\n\t\t\t   <ul class=\"list-bbe\">\r\n\t\t\t   \r\n\t\t\t\t   <li><strong>Measuring Equipment:<\/strong> Instromet Gas.<\/li>\r\n\t\t\t\t   \r\n\t\t\t   <\/ul>\r\n\t\t\t \r\n\t\t\t <h3 class=\"m-t-20\">WATER TREATMENT<\/h3>\r\n\t\t\t   <ul class=\"list-bbe\">\r\n\t\t\t   \r\n\t\t\t\t   <li><strong>Demineralization Plant:<\/strong> Ondeo-Degremont.<\/li>\r\n\t\t\t\t   <li><strong>Water Tanks:<\/strong> Iberfuel.<\/li>\r\n\t\t\t\t   <li><strong>Treated Water Impulsion Pumps:<\/strong> Bombas Itur.<\/li>\r\n\t\t\t\t   \r\n\t\t\t   <\/ul>\r\n\t\t\t \r\n\t\t\t <h3 class=\"m-t-20\">EFFLUENT TREATMENT<\/h3>\r\n\t\t\t   <ul class=\"list-bbe\">\r\n\t\t\t   \r\n\t\t\t\t   <li><strong>Treatment Plant:<\/strong> Ondeo-Degremont.<\/li>\r\n\t\t\t\t   \r\n\t\t\t   <\/ul>\r\n\t\t\t \r\n\t\t\t <h3 class=\"m-t-20\">POWER SYSTEM<\/h3>\r\n\t\t\t   <ul class=\"list-bbe\">\r\n\t\t\t   \r\n\t\t\t\t   <li><strong>Main transformers:<\/strong> ABB Trafo.<\/li>\r\n\t\t\t\t   <li><strong>Auxiliary transformers:<\/strong> ABB Trafo.<\/li>\r\n\t\t\t\t   \r\n\t\t\t   <\/ul>\r\n\t\t\t \r\n         <\/div> \r\n\t\r\n\t<div class=\"col-md-6\">\r\n\t\t\r\n\t\t<h3 class=\"m-t-20\">MEDIUM VOLTAGE BAR SYSTEM<\/h3>\r\n\t\t\t   <ul class=\"list-bbe\">\r\n\t\t\t   \r\n\t\t\t\t   <li><strong>Wiring system:<\/strong> ECN Cable.<\/li>\r\n\t\t\t\t   <li><strong>HV\/MV network assembly and instrumentation:<\/strong> Isotr\u00f3n.<\/li>\r\n\t\t\t   \r\n\t\t\t   <\/ul>\r\n\t\t\r\n\t\t<h3 class=\"m-t-20\">LOW VOLTAGE BAR SYSTEM<\/h3>\r\n\t\t\t   <ul class=\"list-bbe\">\r\n\t\t\t   \r\n\t\t\t\t   <li><strong>LV and MCCs general panel:<\/strong> Consonni.<\/li>\r\n\t\t\t\t   <li><strong>Batteries:<\/strong> Jema.<\/li>\r\n\t\t\t\t   <li><strong>CC switchboard:<\/strong><\/li>\r\n\t\t\t\t   <li><strong>Safe power system:<\/strong> Jema.<\/li>\r\n\t\t\t\t   <li><strong>Emergency diesel groups:<\/strong> Cymasa<\/li>\r\n\t\t\t\t   <li><strong>Internal and external lighting:<\/strong> Tecuni\/Isotr\u00f3n<\/li>\r\n\t\t\t   \r\n\t\t\t   <\/ul>\r\n\t\t\r\n\t\t<h3 class=\"m-t-20\">SUPERVISION AND CONTROL SYSTEM<\/h3>\r\n\t\t\t   <ul class=\"list-bbe\">\r\n\t\t\t   \r\n\t\t\t\t   <li><strong>Distributed control system:<\/strong> Yokogawa.<\/li>\r\n\t\t\t\t   <li><strong>GT-Mark V:<\/strong> General Electric.<\/li>\r\n\t\t\t\t   <li><strong>ST-Mark V:<\/strong> General Electric.<\/li>\r\n\t\t\t   <\/ul>\r\n\t\t\r\n\t\t<h3 class=\"m-t-20\">MECHANICAL ASSEMBLY<\/h3>\r\n\t\t\t   <ul class=\"list-bbe\">\r\n\t\t\t   \r\n\t\t\t\t   <li><strong>BOP equipment, boiler and piping:<\/strong> Babcock Montajes\/Nervi\u00f3n Montajes and Mantenimienetos.<\/li>\r\n\t\t\t\t   <li><strong>Power train:<\/strong> Tamoin Power Services.<\/li>\r\n\t\t\t\t   <li><strong>Seawater intake assembly and chlorination system:<\/strong> Babcock Montajes\/Nervi\u00f3n Montajes and Mantenimienetos.<\/li>\r\n\t\t\t\t   <li><strong>Feed water intake assembly:<\/strong> Babcock Montajes\/Nervi\u00f3n Montajes and Mantenimienetos.<\/li>\r\n\t\t\t\t   <li><strong>Main hoisting operations:<\/strong> Lastra.<\/li>\r\n\t\t\t\t   <li><strong>Overhead cranes:<\/strong> Industrias Electromagn\u00e9ticas G.H.<\/li>\r\n\t\t\t   <\/ul>\r\n\t\t\r\n\t\t<h3 class=\"m-t-20\">PIPES<\/h3>\r\n\t\t\t   <ul class=\"list-bbe\">\r\n\t\t\t   \r\n\t\t\t\t   <li><strong>Rigid and elastic supports for pipes, boiler and auxiliary lines:<\/strong> Pihasa.<\/li>\r\n\t\t\t\t   <li><strong>Pipe system:<\/strong> TSE.<\/li>\r\n\t\t\t\t   <li><strong>Alloyed steel main vapour pipes:<\/strong> Fabricom.<\/li>\r\n\t\t\t\t   <li><strong>Pipe blasting:<\/strong> Brambles.<\/li>\r\n\t\t\t\t   <li><strong>Steel pipes:<\/strong> Tubacero.<\/li>\r\n\t\t\t   <\/ul>\r\n\t\t\r\n\t\t<h3 class=\"m-t-20\">VALVES AND DRIVERS<\/h3>\r\n\t\t\t   <ul class=\"list-bbe\">\r\n\t\t\t   \r\n\t\t\t\t   <li><strong>Control valves:<\/strong> Emerson Process.<\/li>\r\n\t\t\t\t   <li><strong>Electric actuators:<\/strong> Rotork.<\/li>\r\n\t\t\t   <\/ul>\r\n\t\t\r\n\t\t<h3 class=\"m-t-20\">ENVIRONMENTAL IMPACT STUDY<\/h3>\r\n\t\t\t   <ul class=\"list-bbe\">\r\n\t\t\t   \r\n\t\t\t\t   <li><strong>Definition, coordination and drafting of the study:<\/strong> Idom.<\/li>\r\n\t\t\t\t   <li><strong>Study of atmospheric and noise impact:<\/strong> Labein.<\/li>\r\n\t\t\t\t   <li><strong>Study of the hydrodynamic and scattering of heat in the marine environment:<\/strong> Azti.<\/li>\r\n\t\t\t\t   <li><strong>Study of land biota and avifauna:<\/strong> Ekos.<\/li>\r\n\t\t\t   <\/ul>\r\n\t\t\r\n\t\t\r\n\t\t<h3 class=\"m-t-20\">OTHERS<\/h3>\r\n\t\t\t   <ul class=\"list-bbe\">\r\n\t\t\t   \r\n\t\t\t\t   <li><strong>Civil works:<\/strong> Seridom.<\/li>\r\n\t\t\t\t   <li><strong>Marine\/emissary civil works:<\/strong> Ferrovial.<\/li>\r\n\t\t\t\t   <li><strong>Compressed air system:<\/strong> Atlas-Copco.<\/li>\r\n\t\t\t\t   <li><strong>Emissions monitoring system:<\/strong> ABB.<\/li>\r\n\t\t\t\t   <li><strong>Pressure and temperature instrumentation:<\/strong> Instrumentos Wika.<\/li>\r\n\t\t\t\t   <li><strong>Sample taking:<\/strong> Siemsa.<\/li>\r\n\t\t\t\t   <li><strong>Cathodic protection:<\/strong> WWI Procat.<\/li>\r\n\t\t\t\t   <li><strong>Fireproofing:<\/strong> Pacisa.<\/li>\r\n\t\t\t\t   <li><strong>Heating and air-conditioning for control building and offices:<\/strong> Microclima.<\/li>\r\n\t\t\t\t   <li><strong>Pipe blasting:<\/strong> Brambles.<\/li>\r\n\t\t\t\t   <li><strong>Chemical cleaning:<\/strong> Berako.<\/li>\r\n\t\t\t\t   <li><strong>Visualization wall:<\/strong> Aplein Ingenieros.<\/li>\r\n\t\t\t   <\/ul>\r\n            \r\n         <\/div>\r\n      <\/div>\r\n\t\r\n\r\n\t\r\n\t\t<\/div><\/section>\r\n\t\r\n\t<!-- Information on the construction of the Bah&iacute;&shy;a of Bizkaia Electricidad (BBE).: END -->","protected":false},"excerpt":{"rendered":"<p>Plant management In general terms, the plant is operated from the control room which sends out the requisite number of monitoring and control signals to execute the actions involved in running the plant. The gas turbine, steam turbine and other packaged plant facilities located at the site such as the water treatment plant, the chemical [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":2243,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"templates\/page-hero-subtitle-parent.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-1860","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.bbe.es\/en\/wp-json\/wp\/v2\/pages\/1860","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bbe.es\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.bbe.es\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.bbe.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bbe.es\/en\/wp-json\/wp\/v2\/comments?post=1860"}],"version-history":[{"count":6,"href":"https:\/\/www.bbe.es\/en\/wp-json\/wp\/v2\/pages\/1860\/revisions"}],"predecessor-version":[{"id":2577,"href":"https:\/\/www.bbe.es\/en\/wp-json\/wp\/v2\/pages\/1860\/revisions\/2577"}],"up":[{"embeddable":true,"href":"https:\/\/www.bbe.es\/en\/wp-json\/wp\/v2\/pages\/2243"}],"wp:attachment":[{"href":"https:\/\/www.bbe.es\/en\/wp-json\/wp\/v2\/media?parent=1860"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}